Our Projects
AIC Kewdale
MMB supplied AIC Kewdale with Mechanical Electrical and Controls installation comprising of supply and installation of a Mechanical Services Switchboard and an Alerton BMS system integrating to air conditioning and ventilation systems.
Balga TAFE Dust Hoppers
This project required replacement of four dust hoppers. Decommission existing dust hoppers. Complete electrical installation for four new dust hoppers including supply and installation of four new dust hopper distribution boards
bP Muchea
Project involved Mechanical Electrical and controls installation including supply of one Mechanical services switchboard and DDC control interface to ventilation systems, electrical connection of cool room and freezer room.
ESA New Norcia
MMB worked with ESA to engineer Mechanical Electrical and Controls installation. Upgrade of existing Mechanical Services switchboard and siemens BMS system and integration to existing and new air conditioning and ventilation systems.
HEA Winders
Client required a control panel for high voltage motor winding press. Control panel was supplied complete with PLC controls.
IGA South Perth
MMB delivered Mechanical Electrical installation. Supply and install Mechanical Services switchboard complete will all power and controls to air conditioning and ventilation equipment
Salvado Christian College
Salvado Christian College required Mechanical Electrical and controls installation including the supply and installation of two Mechanical services switchboard and Reliable controls DDC control interfaced to air conditioning and ventilation equipment including a central relief air system controlled via weather station/ambient conditions interlocked with AC units and motorised damper motors throughout the building.
Aranmore Catholic College
Our team completed Mechanical Electrical Installation including supply and installation of Mechanical services switchboard and Ambient lockout control panel integrating to Air conditioning unit manufacturers proprietary controls.
South Regional TAFE
MMB supplied South Regional TAFE Mechanical Electrical and BMS system installation. Supply and installation of four Mechanical Services Switchboards and Reliable Controls BMS system integrated to Daikin VRV systems and Ventilation equipment.
St Joseph's College
Client required Mechanical Electrical and BMS system installation. Supply and installation of three Control panels and Reliable Controls BMS system integrated to Daikin VRV systems and Ventilation equipment.
Waste to energy Plant
Project required Mechanical Electrical installation. Supply three Mechanical Services Switchboards and interface controls to Wall split systems, outside air systems, workshop evaporative coolers and minor exhaust fans.